Kitchen renovation in the GTA, with only 2 days without a kitchen
Calico Designs and Renovations designs and builds kitchen renovations across the Greater Toronto Area. You can see the whole kitchen as a 3D rendering and approve it before anything is removed, and your old kitchen stays in place and usable until the design is signed off. Demolition and installation then happen back to back, so you are without a working kitchen for only 2 days.
Free first consultation and site visit, anywhere in the GTA.
Illustration only, not a completed project.
What makes working with us different
01
See it in 3D before work starts
Ask for a full rendering of your project and approve the design before anything is built.
02
Your kitchen stays usable
We don’t demolish at contract signing. Your old kitchen stays in place through design and sign-off, then demolition and installation happen back to back. You are without a working kitchen for only 2 days.
03
Designed to your budget
We work within your budget, as long as it is realistic, and design from your mood board and inspiration photos.
What a kitchen renovation includes
A kitchen renovation replaces the parts of the room you use and see every day: cabinets, countertops, sink and faucet, backsplash, flooring, and lighting. Depending on what you want, it can also change how the room is laid out by adding an island, moving the sink or range, or opening a wall to the dining or family room.
We handle the project from the first sketch to the final walkthrough. That covers design, the 3D rendering, permits where they are needed, demolition, plumbing, electrical, cabinet installation, countertops, tile, flooring, and painting.
Who it’s for
Most of our kitchen clients are homeowners in Oakville and similar GTA communities with a kitchen that has reached the end of its life. The house is fine; the kitchen is dated, short on storage, or closed off from the rest of the main floor.
They usually come to us with two worries. The first is cost. The second, and often the bigger one, is being without a working kitchen for weeks. This page answers both.
Signs your kitchen is due
Cabinet doors sag, drawers stick, and the boxes are swollen or worn at the edges.
The countertop is chipped, stained, or lifting at the seams.
There is never enough storage, and the counters are always full.
Two people cannot cook at the same time without getting in each other’s way.
The kitchen is cut off from the room where the family actually spends time.
Lighting is one fixture in the middle of the ceiling.
You are replacing appliances and the new ones don’t fit the old openings.
One or two of these can be fixed with a repair. Several together usually mean a renovation is the better use of money.
How we keep your kitchen usable
Many contractors start demolition soon after the contract is signed, then design, order, and wait while the room sits empty. That is where the stories of months without a kitchen come from.
We work the other way around. We don’t demolish at contract signing. Your old kitchen stays in place, and you keep cooking in it, through the whole design stage. Only when the design is approved do we schedule the build, and then demolition and installation happen back to back:
Design and sign-off. Your old kitchen is untouched. You review the design, ask for changes, and approve it.
Demolition and preparation. These start 7 to 9 days after design approval.
Cabinets. Installed in one day.
Countertops and everything else. The next day.
In total, you are without a working kitchen for 2 days.
Phone conversation. You tell us about the kitchen, what bothers you, and roughly what you want to spend.
Free site visit. We come to your home, measure, and look at what is behind the decisions: where the plumbing runs, which walls carry load, how old the wiring is.
Budget and design. We agree on a realistic budget first, then design to it, working from your mood board and inspiration photos.
3D rendering. On request, we produce a full 3D rendering so you can see cabinets, colours, and layout before committing.
Approval. Nothing is removed from your home until you have approved the design.
Build. Demolition, preparation, cabinets, countertops, and finishing, scheduled back to back.
A like-for-like kitchen, with new cabinets, counters, and fixtures in the same positions, does not normally need a building permit in Ontario. You will need one if the work includes:
removing or altering a load-bearing wall,
adding plumbing fixtures or relocating drains,
changing ductwork, including some range hood installations that alter the heating system, or
creating or enlarging a window or door opening.
Electrical work is handled separately and inspected through the Electrical Safety Authority. Each city has its own building department and its own review times, which we cover on our city pages for Oakville, Mississauga, and Toronto, and in our guide to renovation permits in Ontario.
Setting a budget
“How much does a kitchen renovation cost?” is the first question nearly every client asks, so we publish our price tiers below instead of making you call to find out. The short version: decide what you can comfortably spend, tell us early, and we will show you what that budget can build. Our kitchen renovation cost guide explains where the money goes.
Kitchen renovation cost: three price tiers
These ranges are average market prices in the GTA, per project. Your project can cost less or more depending on your preferences. Your exact price comes after a free consultation and site visit, once we know your space, your finishes, and your budget.
Essential
$25k–$40k
A full refresh that keeps the existing layout, so plumbing, gas, and wiring stay where they are.
New stock or semi-custom cabinets in the same footprint
Laminate or entry-level quartz countertops
New sink, faucet, and backsplash
Updated lighting on existing circuits
Mid-range
$40k–$75k
The most common choice. Better cabinetry and some changes to how the room works.
Semi-custom cabinets with organisers and soft-close hardware
Quartz countertops and a full-height tile backsplash
An island or peninsula, or a moved sink or appliance
New flooring, pot lights, and under-cabinet lighting
Premium
$75k–$150k+
A new layout with custom work, often opening the kitchen to the next room.
Fully custom cabinetry and panelled appliances
Natural stone or premium quartz, including waterfall edges
Walls removed or moved, with engineering and permits
Relocated plumbing, gas, and electrical
What moves the price up or down
Layout changes. Keeping the sink, range, and fridge where they are is the single biggest saving. Moving plumbing, gas, or a wall adds trades, permits, and time.
Cabinets. Usually the largest line in the budget. Stock, semi-custom, and custom cabinetry differ in price far more than they differ in looks.
Countertops. Laminate, quartz, and natural stone sit at very different price points, and long runs or waterfall edges need more material.
Appliances. These are not included in the ranges above and are bought separately. Decide early, because panel-ready and built-in models change the cabinet design.
What is behind the walls. Older GTA homes can hide outdated wiring, old plumbing, or uneven floors that have to be fixed once they are found.
Size. More cabinets, more counter, more flooring. A galley kitchen and a large open kitchen are different projects.
Start with a free visit
We’ll look at the space, talk through your budget and inspiration, and tell you honestly what it can achieve.
Plumbing, HVAC, electrical, and structural engineering are all done by our own team, not passed to outside companies, with working-at-heights certification on site.
TODO: check the licence wording against the certificates before launch.
Insured and covered
$5 million liability insurance, WSIB coverage, and an $11 million bond.
Warranty
Up to 8 years. The length depends on the project, and your warranty terms are written into your contract.
Awards
HomeStars Best of 2024 and 2025, TrustedPros Best of 2025, and Best of Houzz 2026.
TODO: add links to the TrustedPros and Houzz profiles.
Kitchen renovation: questions we hear most
How long will I be without a kitchen?
+
With Calico Designs and Renovations your old kitchen stays in place and usable through the whole design stage. Demolition and preparation start 7 to 9 days after you approve the design, the cabinets are installed in one day, and the countertops and everything else follow the next day. In total, you are without a working kitchen for 2 days.
How much does a kitchen renovation cost in the GTA?
+
As a starting guide, a kitchen renovation in the GTA runs from about $25,000 to $40,000 for an essential refresh in the same layout, $40,000 to $75,000 for a mid-range kitchen, and $75,000 to $150,000 or more for a premium kitchen with a new layout and custom cabinetry. Exact pricing is given after a free consultation and site visit. These are average market prices and can be lower or higher depending on your preferences.
Can I see the kitchen before you start?
+
Yes. You can ask for a full 3D rendering of your new kitchen and approve the design before any work begins. Changes are made on screen at the design stage, where they cost nothing to build, instead of on site.
Do I need a building permit to renovate my kitchen?
+
In Ontario, replacing cabinets, countertops, flooring, and fixtures in the same place does not normally need a building permit. A permit is needed when you remove or alter a load-bearing wall, add or relocate plumbing, change ductwork, or cut a new window or door opening. Electrical work is inspected separately through the Electrical Safety Authority. Each GTA municipality runs its own permit office.
Will you work with my budget?
+
Yes, as long as the budget is realistic for the size of the kitchen. We talk about budget before we design, then design from your mood board and inspiration photos so the plan you approve is one you can afford to build.
Can we stay in the house during the renovation?
+
Yes, you can stay in your home during a kitchen renovation. Because we do not demolish until the design is approved, you are without a working kitchen for only 2 days.
Which areas do you serve?
+
Calico Designs and Renovations serves the Greater Toronto Area, including Oakville, Mississauga, Toronto, Burlington, Etobicoke, Milton, and Vaughan. We travel to you; the first consultation and site visit are free.